We worked closely with TSL on the largest project we have undertaken to date all the way through feasibility, outline design, detailed design, process design, build and fit out. From start to finish TSL were a pleasure to work with, approaching everything with a rare “can do” attitude and being thoroughly professional at every turn. We are delighted with the resulting building (which we started making food in 5 days ahead of a date we had set 2 years out) and look forward to working with the TSL team on future projects. I have already recommended them to several other companies and will continue to do so.
Charlie Bigham - CEO
Overview
Food
Charlies vision was to create a unique and sustainable production facility which would provide light and space for staff and achieve environmental objectives as well as be architecturally in keeping with the environment. TSL assisted in selecting a suitable site and bringing utilities to the site.

The detailed Design, Planning Submission and Cost plans were also provided by TSL as well as Construction, Equipment Co-ordination and Installing and Commissioning. The project was finished on time thanks to good collaboration between the Client and TSL. The result is an exceptionally high-quality production facility.
Size
6,500m2
Location
Somerset
Duration
46 weeks
Completed
Summer 2017