Your technical construction partner
Growing with our clients in the Logistics industry, we are well-placed to support and deliver both small and large scale projects. In the last three years, we have built over eight million sqft of logistics space in the UK alone.
Our clients work with us time and time again due to our consistently high standards, competitive costs and speed of construction. We will help you maximise your opportunities by being up to 30% quicker that other construction companies.
We deliver outstanding projects that we are extremely proud of. Our project teams work with our clients to ensure projects are delivered on time and on budget. Below are some examples of our projects throughout the world. If you would like to know more, please contact us.
This project for Amazon included the demolition of existing buildings and the refurbishment of an existing warehouse.
Size
129,166 sq ft
Location
Essen, Germany
Completed
November 2019
TSL has become a key construction partner to Lidl for their multi-chamber RDCs. These projects are delivered as turnkey solutions including ammonia refrigeration systems.. The Lidl Luton project is the largest facility ever constructed and consists of a mix of temperature cold rooms, ambient racking storage, 5,000m2 freezer, MHE mezzanine and 7m deep basement which will house a 35m high clad rack storage solution
Size
1.3m sq ft
Location
Luton
Completed
December 2022
TSL was the Main Contractor and coordinated every aspect of the build from design coordination, utilities, planning, construction and fit out on behalf of Lidl
Size
400,000 sq ft
Location
Belvedere, London
Completed
May 2022
TSL were responsible for the full refurbishment of the 16,000 m2 robotics floor at Amazon’s sortation centre in Witten.
Size
172,222 sq ft
Location
Witten, Germany
Completed
August 2021
This sortation centre for Amazon has a total floor area of 5,400 m2 and achieved BREEAM ‘Very Good’.
Size
62,430 sq ft
Location
Wolfhagen, Germany
Completed
September 2020
TSL GmbH completed a refurbishment of Amazon’s existing last mile delivery centres at Eggolsheim with a total floor area of 10,500 m2.
Size
113,021 sq ft
Location
Eggolsheim, Germany
Completed
September 2019
TSL was the main contractor and managed all aspects of this project. We were responsible for the construction of both a regional distribution centre and van storage centre.
Size
100,000 sq ft
Location
Belfast
Completed
August 2020
TSL was the main contractor and managed every aspect of the project from build from design coordination, utilities, planning, construction and fit out on behalf of DHL.
Size
530,000 sq ft
Location
Worksop
Completed
July 2020
We were awarded this project to act as principal contractor for the design and build of a warehouse plus a 3-level van parking with 250 spaces.
Size
107,600 sq ft warehouse 150,700 sq ft Van parking
Location
Lengede, Germany
Completed
September 2020
We were awarded this project to act as principal contractor for the fit-out of an existing warehouse. The team in Germany provided an initial feasibility report, cost management, and design, construction and fit-out of the new and existing premises. The project handed over on time thanks to good collaboration between the Client and TSL.
Size
968,750 sq ft
Location
Munich, Germany
Completed
March 2021
For this last-mile distribution centre to meet the growing e-commerce demand, we worked closely with the client’s architect to refine the design of the facility. The project team provided all construction management and services to convert the existing facility into a state-of-the-art centre.
Size
106,000 sq ft
Location
Tampa, FL
Completed
August 2020
A new distribution hub with 200,000 sq ft of office space which was built over three storeys.
Size
1,000,000 sq ft
Location
Lutterworth
Completed
February 2019
A new multi-temperature controlled RDC was built to replace a smaller one in Lutterworth.
Size
510,000 sq ft
Location
Peterborough
Completed
May 2020
Originally a brownfield site, we provided a base-build and fit out over three storeys, including all mechanical and electrical services, sprinklers and refrigeration. Working in partnership with the client, including their suppliers, consultants and statutory bodies, we provided early access dates and delivered the project on time and on budget
Size
450,000 sq ft
Location
Wednesbury
Completed
November 2016
A new 131 acre extension totalling 1.2 million sq ft was developed within Magna Park South. TSL built four facilities in total, ranging from 126,242 sq ft to 700,430 sq ft
Size
1,200,000 sq ft
Location
Lutterworth
Completed
April 2020
A brand new temperature controlled distribution centre with over 190,000 sq ft freezer and chill
Size
500,000 sq ft
Location
Felixstowe, Suffolk
Completed
April 2021
Your construction partner for advanced manufacturing, data centres, food, logistics and pharmaceuticals. Explore our sectors below:
With offices all over the world, we truly are your technical construction partner with the ability to tailor our services to meet your needs.
FIND OUT MORE© TSL Ltd 2023
Head Office
TSL Ltd
Chalfont Park House
Chalfont Park
Gerrards Cross
Buckinghamshire
SL9 0DZ
+44 (0) 845 330 7311
info@tslprojects.com
© TSL Ltd 2023